Project:

LNG Terminal on the Island of Krk

1

Project map location

Project description
Increased security of supply and ensuring sufficient quantities of natural gas for the Republic of Croatia and countries of the region.
The project involves the following construction activities: 
The LNG Terminal, covering the area of 35 hectares, has the capacity of 15 billion m³ of natural gas and the possibility to accommodate the largest LNG ships with an 18-meter draft.

Location: LNG Terminal on the Island of Krk

Status of property:DINA-Petrokemija plc. in liquidation Omišalj, maritime domain

Realization model:open negotiation options

Developed documents: 
Studies:

  • environmental study

Project documentation:

  • designing project

Contact person:
Goran Frančić, Director
LNG Croatia Llc.
Radnička cesta 80, 10 000 Zagreb
Phone: +385 1 4094 600
E-mail: info@lng.hr
Web: www.lng.hr

Project:

Ruševo Krmpotsko Wind Farm

2

Project map location

Project description
The main purpose of the facility is wind power production. The construction of a wind farm as an ecologically acceptable and available energy source would contribute to an increase of renewable energy source share in the Republic of Croatia, which is one the priorities of EU 2020 growth strategy.
The project includes the construction of an energy conversion plant, as well as the construction of individual plants connected with electric power production from the wind, such as one or more wind turbines with pertaining substations and power lines, as well as control and other facilities for the wind farm. The maximum allowed height of auxiliary facilities is 10 m, the allowed number of floors being P+1.
The permitted area for wind farm development is 30 km², and the maximum allowed power of the Ruševo Krmpotsko wind farm will be 90 MW. The power of single wind turbines will be limited to 3 MW.

Location:City of Novi Vinodolski – area of Krmpote

Ownership:Republic of Croatia

Realization model: open negotiation options

Developed documents: 
Physical planning documents:

  • the project is in compliance with the physical planning documents

Contact person:
Velimir Piškulić, Mayor
City of Novi Vinodolski
Trg Vinodolskog zakona 1, 51250 Novi Vinodolski
Phone: +385 51 554 350
Fax: +385 51 554 374
E-mail: gradonacelnik.v@novi-vinodolski.hr
Web: www.novi-vinodolski.hr

Project:

Solar Power Plants

3

Project map location

Project description
Renewable energy sources are a very important developmental component for the Primorje-Gorski Kotar County and are a part of all strategic documents. The goal is to achieve a high quota of renewable energy sources within the scope of sustainable County development. A high level of potential solar energy utilization can be found in coastal and insular areas.
The project involves the following construction activities: 
Installation of solar farms of up to 50 hectares is adequate for planned Site, having a maximum power output of 10 MW per location.

Location: area of Primorje-Gorski Kotar County

Ownership: state and privately owned

Realization model: open negotiation options

Developed documents: 
Physical planning documents:

  • a portion of the site has already been defined by the PrimorjeGorski Kotar County Physical Plan and the remainder will be determined by physical plans of municipalities and cities

Incentive fee 
According to the Tariff System for the Production of Electric Energy from Renewable Energy Sources and Cogeneration (official gazette of the Republic of Croatia Narodne novine 133/13, 151/13, 20/14, 107/14, 100/15).

Contact person:
Darko Jardas, Director
Regional Energy Agency Kvarner Ltd.
Ciottina 17b 51000 Rijeka
Phone: +385 51 631 844
Fax: +385 51 263 751
E-mail: darko.jardas@reakvarner.hr
Web: www.reakvarner.hr

Project:

Wind Power Plants

4

Project map location

Project description
Renewable energy sources are a very important developmental component for the Primorje-Gorski Kotar County and are a part of all strategic documents. The goal is to achieve a high quota of renewable energy sources within the scope of sustainable county development. A high level of potential wind energy utilization can be found in inland county areas, ready to be exploited based on finalized research and favourable Northeast and Southeast winds that are typical for coastal inland areas, while Southwest winds are a trait of the Kvarner Bay.
The project involves the construction of windmills is planned on the selected site.

Location: area of Primorje-Gorski Kotar County

Ownership: state and privately owned

Realization model:opened possibility of negotiating with the condition of prior connection approval

Developed documents: 
Physical planning documents:

  • a portion of the site has already been defined by the PrimorjeGorski Kotar County Physical Plan and the remainder will be determined by physical plans of municipalities and cities

Incentive fee
According to the Tariff System for the Production of Electric Energy from Renewable Energy Sources and Cogen - eration (official gazette of the Republic of Croatia Narodne novine 133/13, 151/13, 20/14, 107/14, 100/15). 

Contact person:
Darko Jardas, Director
Regional Energy Agency Kvarner Ltd.
Ciottina 17b 51000 Rijeka
Phone: +385 51 631 844
Fax: +385 51 263 751
E-mail: darko.jardas@reakvarner.hr
Web: www.reakvarner.hr